Week 5: Adding detail to the alley

This is were I have really started bringing the alley construction together. I have started to add the window and door elements modelled by Jeff and also some lights from Sam. Also I've started to destroy some of the parts I made earlier to add to the destruction and give the impression of areas collapsing.




Monday, 29 October 2007

Week 5: More Modelling





These are some more shots of my modelling. This is a continuation of my work on the overpass in the alley and also a stairwell I have worked on for further down the alley. I have put these in a quick mock up alley which I aim to extend with Jeff once we have started to swap elements such as windows and doors.

Sunday, 28 October 2007

Week 4: Environment Design


This is a rough layout of the side on view of the alley which should give me a good idea for scaling and positioning of the features. I will work to this as this seems to fit the narrative and allow for the camera we want to use.

Saturday, 27 October 2007

Week 4: Production Schedule

Hey guys, I've updated the production schedule for the week, obviously changed it because Matt has finished his modelling and rigging, Also I think we would like to spend a little longer on modelling considering how good the results are, and we can obviously spend less time on texturing now because we found it will be easier texturing on the large flat planes we have for the sides of the buildings. Anyways heres the plan.

Week 4: Modelling


This is a screenshot of the first piece of modelling I did. I started from this as a central point in my alleyway. I will then start to develop around this. I have also worked on a roof for this overpass area. I'm also working closely with Jeff as he is modelling alot of the smaller features such as windows and doors so we may use these again on different buildings in both our areas.

Week 4: Storyboarding



This week we brought our final storyboards together to see how the narrative would work. We each storyboarded our own designated section and then linked them up and we agreed this was working well. Here are my storyboards I illustrated.

Thursday, 18 October 2007

Week 3: Production Schedule


I've whacked up this as a rough production schedule. It might be different to the one we put together as a group but I think we can use this until next week and then re-evaluate it then. Its got a section for each person and its very rough and sketchy at the moment. Also I've noted down the lectures we have on each of the days and a progress tracker for individual tasks on the right hand side. I'll post this on the main blog aswell as my own blog.